0 Cart
  • Free Shipping over $199.99

  • 5% Off Discount Code: wowo

  • Promotion Time (01.01-12.31)

  • day ::

This product was successfully added to cart!

View Shopping Cart

SKP55 Siemens electro-hydraulic actuator gas solenoid valve burner spare parts

SKP55 Siemens electro-hydraulic actuator gas solenoid valve burner spare parts

SKU: #001 - In Stock
USD$156.00

  • airport Shipping:  International shipping available
  •  Shipping time:   Standar(10-20 business days), Rush(5-10 business days)
  • chip Discount:  Get 2% discount on orders of USD $100.00,Get 3% discount on orders of USD $200.00
  • compass Handling time:  Ships within 3 business days after receiving cleared payment
  • available_updates Returns:  7 days money back guaratee,buyer pays return shipping

Product Detail

Customer Reviews

Shipping Guide

Delivery Time

Product Tags

Electro-hydraulic actuator SKP55 function

 

□ SKP55… Used as differential pressure regulator

 

It is mainly used in

 

- Combustion unit used in combination with heat recovery system

 

- Burner with adjustable fuel/air mixing ratio device in the head

 

- devices in which the pressure conditions in the burner or combustion chamber do not change proportionally with changes in load

 

- installations with a negative pressure stage on the gas or air side

 

technical parameter:

 

Mains voltage AC 220 V –15 % to AC 240 V +10 %

 

Mains voltage AC 100 V –15 % to AC 110 V +10 %

 

Main frequency 50 to 60 Hz ±6 %

 

Power consumption 13.5 VA max

 

100 % of travel

 

Full stroke opening time 6 to 10 s (depending on valve size, longer opening time below 0°C)

 

Opening speed approx. 2 mm / s

 

Turn off time < 0.8 s (in case of power failure)

 

Siemens electro-hydraulic actuator SKP55 technical parameters:

 

Model Protection class weight Allow test pressure Allow vacuum test pressure Describe
  kg    
AC 100-110 AC 220-240 V     mbar mbar
SKP55.003E1 SKP55.003E2 IP54 1.9 1000 200 Safe cut off
no end switch
With differential pressure regulator
SKP55.001E1 SKP55.001E2 IP54 1.9 1000 200 Safe cut off
with end switch
With differential pressure regulator

 

Model:
--- Please Select ---

Write a review here:

  • 1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
    Loading ... Loading ...

  • nine − 5 =

  • JPEG only
  • The following is the process you should take to complete your order through bank to bank transfer:

    1. Please go to your bank (through online banking, ATM or going into a branch) and complete the transfer of money. Make sure that the amount you transfer is the exact total of your order. Payment details below:

    - If your bank is located in Austria, Germany, Spain, France, United Kingdom, Italy, Netherlands, Belgium, Finland, Greece or Luxemburg you will pay to our WorldPay bank. You will see the bank details once you have placed the order.

    PLEASE NOTE: If you are paying to our WorldPay bank you MUST include the Unique Payment Reference Number (you will receive this directly after paying the order) in the description section when completing payment to help us identify your order. Failure to do this will result in an unsuccessful transaction.

    - If your bank is located in a country not listed above you will pay to our HSBC account. The details are below:

    Bank Account:
    Bank Code:
    Beneficiary:
    Bank Name:
    Bank Address:
    SWIFT Code:

    PLEASE NOTE: If you are paying in this way you MUST write your Yourname order number in the description section when paying so we can easily recognize your payment. Failure to do this will result in a delayed or failed transaction.

    2. When this is done, log in to your Yourname ‘My Account’ and complete the following:

    Click ‘Order list’
    Click ‘Pay’
    Click ‘Complete Payment’ and fill in the related information for verification (This is an important step. If the information you have filled in does not match your bank details the payment can not be completed.)
    Click ‘Submit’ to finish the procedure.

    3. You will receive a payment confirmation email from us after your order’s payment has gone through successfully. If you do not receive this email, please contact us here: http://www.Yourname.com/help/

    Please note that Yourname will begin to handle your items after payment has been cleared.

    The tailoring and handling time is the number of business days we will take to process your items before shipping them. This processing includes order verification, item manufacturing, quality checking and packaging. This does not include the shipping time.

    Different items and categories have different tailoring and handling times. However, on each item page the information is displayed next to the item photo as shown in the picture below.

    Tags: , , , , , , , ,

    Customers Also Bought:

    INQUIRY DETAILS *

    INQUIRY NOW
    • captcha