0 Cart
  • Free Shipping over $199.99

  • 5% Off Discount Code: wowo

  • Promotion Time (01.01-12.31)

  • day ::

This product was successfully added to cart!

View Shopping Cart

MB-VEF407 B01 S10 DUNGS gas solenoid valve MB-VEF series gas burner accessories

MB-VEF407 B01 S10 DUNGS gas solenoid valve MB-VEF series gas burner accessories

SKU: #001 - In Stock
USD$156.00

  • airport Shipping:  International shipping available
  •  Shipping time:   Standar(10-20 business days), Rush(5-10 business days)
  • chip Discount:  Get 2% discount on orders of USD $100.00,Get 3% discount on orders of USD $200.00
  • compass Handling time:  Ships within 3 business days after receiving cleared payment
  • available_updates Returns:  7 days money back guaratee,buyer pays return shipping

Product Detail

Customer Reviews

Shipping Guide

Delivery Time

Product Tags

DUNGS gas solenoid valve MB-VEF series common specifications and related parameters

The MB-VEF series solenoid valve of DUNGS integrates the solenoid valve, filter and regulator into a compact unit, and realizes the functions of filtration, regulation, safety cut-off and control through the combined system. Its structural features are as follows:

□ Equipped with dirt depositor and filter.

□ The ratio of gas and air pressure can be adjusted with high sensitivity.

□ Comply with the provisions of DINEN161 standard A class 2 equipment. Input pressure up to 360mbar.

□ Proportional regulator in line with EIN EN88A class 2 equipment standard, which can adjust output pressure and flow sensitively.

□ In the case of low pressure difference, the highest flow rate is achieved.

□ Driven by a DC solenoid valve with an interference degree of N.

□ External pulse circuit.

□ Easy installation, small size and light weight.

application

It is suitable for Ⅰ, Ⅱ, Ⅲ gas and other neutral gaseous media.

Certification Certificate EU Prototype Test Certificate issued in accordance with EU Gas Equipment Directive: CE-0085AN2802

DMV-…DN65-125 CE-0085BO0236 EU Prototype Test Certificate issued in accordance with EU Pressure Equipment Directive: CE0036 Certificates of other major gas consuming countries.

 

Model Maximum input working pressure mbar Maximum output working pressure mbar opening time Caliber Ambient temperature °C Weight
°C [kg]
mbar mbar
MB-VEF407 B01 S10 360mbar 5-100 <1s Rp3/4 45 3.5
MB-VEF412 B01 S10 360mbar 5-100 <1s Rp11/4 45 5.9
MB-VEF415 B01 S10 360mbar 5-100 <1s Rp11/2 45 6.7
MB-VEF420 B01 S10 360mbar 5-100 <1s Rp2 45 7.9
MB-VEF425 B01 S10 360mbar 5-100 <1s Rp2 45 12.6
MB-VEF407 B01 S30 360mbar 100-360 <1s Rp3/4 45 3.5
MB-VEF412 B01 S30 360mbar 100-360 <1s Rp11/4 45 5.9
MB-VEF415 B01 S30 360mbar 100-360 <1s Rp11/2 45 6.7
MB-VEF420 B01 S30 360mbar 100-360 <1s Rp2 45 7.9
MB-VEF425 B01 S30 360mbar 100-360 <1s Rp2 45 12.6
Model:
--- Please Select ---

Write a review here:

  • 1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
    Loading ... Loading ...

  • × three = 6

  • JPEG only
  • The following is the process you should take to complete your order through bank to bank transfer:

    1. Please go to your bank (through online banking, ATM or going into a branch) and complete the transfer of money. Make sure that the amount you transfer is the exact total of your order. Payment details below:

    - If your bank is located in Austria, Germany, Spain, France, United Kingdom, Italy, Netherlands, Belgium, Finland, Greece or Luxemburg you will pay to our WorldPay bank. You will see the bank details once you have placed the order.

    PLEASE NOTE: If you are paying to our WorldPay bank you MUST include the Unique Payment Reference Number (you will receive this directly after paying the order) in the description section when completing payment to help us identify your order. Failure to do this will result in an unsuccessful transaction.

    - If your bank is located in a country not listed above you will pay to our HSBC account. The details are below:

    Bank Account:
    Bank Code:
    Beneficiary:
    Bank Name:
    Bank Address:
    SWIFT Code:

    PLEASE NOTE: If you are paying in this way you MUST write your Yourname order number in the description section when paying so we can easily recognize your payment. Failure to do this will result in a delayed or failed transaction.

    2. When this is done, log in to your Yourname ‘My Account’ and complete the following:

    Click ‘Order list’
    Click ‘Pay’
    Click ‘Complete Payment’ and fill in the related information for verification (This is an important step. If the information you have filled in does not match your bank details the payment can not be completed.)
    Click ‘Submit’ to finish the procedure.

    3. You will receive a payment confirmation email from us after your order’s payment has gone through successfully. If you do not receive this email, please contact us here: http://www.Yourname.com/help/

    Please note that Yourname will begin to handle your items after payment has been cleared.

    The tailoring and handling time is the number of business days we will take to process your items before shipping them. This processing includes order verification, item manufacturing, quality checking and packaging. This does not include the shipping time.

    Different items and categories have different tailoring and handling times. However, on each item page the information is displayed next to the item photo as shown in the picture below.

    Tags: , , , , , , , ,

    Customers Also Bought:

    INQUIRY DETAILS *

    INQUIRY NOW
    • captcha