0 Cart
  • Free Shipping over $199.99

  • 5% Off Discount Code: wowo

  • Promotion Time (01.01-12.31)

  • day ::

This product was successfully added to cart!

View Shopping Cart

LME51.000B2 Siemens Burner Controllers Siemens LMV series burner controller

LME51.000B2 Siemens Burner Controllers Siemens LMV series burner controller

SKU: #001 - In Stock
USD$156.00 USD$156.00 (% off)

  • airport Shipping:  International shipping available
  •  Shipping time:   Standar(10-20 business days), Rush(5-10 business days)
  • chip Discount:  Get 2% discount on orders of USD $100.00,Get 3% discount on orders of USD $200.00
  • compass Handling time:  Ships within 3 business days after receiving cleared payment
  • available_updates Returns:  7 days money back guaratee,buyer pays return shipping

Product Detail

Customer Reviews

Shipping Guide

Delivery Time

Product Tags

LMV series burner controller

Technical performance and structural characteristics:

The LMV… system, with dual processors for startup, alarms and operational faults, provides superior status monitoring (high definition display) and remote display. Full-featured, easy-to-use application software

The burner start-stop, fuel supply is selected or set by AZL… or other control system. It has the functions of providing the control of the running mode, printing the running report and so on.

Process data: run and lock information

Temperature or pressure: current operating state

Flue gas oxygen content: self-diagnosis

Combustion Efficiency: Locking the Record

Fuel metering: fault log

The new LMV5…Large burner (>2MW) management system adopts the concept of advanced “electronic” air/fuel ratio control, and controls the fuel execution and throttle actuator separately through the Can bus to achieve the desired combustion air/fuel ratio. The ideal combustion efficiency is achieved with a relatively minimum amount of excess air. The system can control four actuators simultaneously, or can be expanded to six as needed for high-end combustion control needs.

Installation Precautions:

1. Safe start-up and flame detection of the burner.

2. Safe and reliable gas valve leak detection.

3. Control the air/fuel ratio set to keep the same.

4. The temperature or pressure of the boiler is controlled according to the preset PID algorithm (optional).

It can also be controlled by an external control device.

The LMV… system, with dual processors for startup, alarms and operational faults, provides superior status monitoring (high definition display) and remote display.

Full-featured, easy-to-use application software.

Installation Precautions:

1. The controller unit and other cables must be installed separately from the high voltage ignition cable. Do not confuse phase and neutral. Install switches, fuses, grounding, etc., in accordance with local regulations.

2. It must be confirmed that the maximum current allowed by the terminal is not exceeded. Do not connect mains power to the output terminals of the combustion controller.

3. Isolate the burner controller from the mains power supply with an all-polar switch, leaving at least a 3mm contact gap.

4. Protect the ground bushing under the chassis with a metric screw and loose washer.

5. An AGK25 must be connected to terminal 3 of the controller without the use of a fan, otherwise the burner cannot start reliably.

6. For safety, connect the neutral wire to the neutral distributor or terminal 2 on the bottom of the insert block. Combustion components (fans, ignition transformers, and gas valves) are listed in Figure 7435a14 and must be connected to the neutral conductor as shown below.

7. The connection between the neutral conductor and terminal 2 is pre-wired at the bottom of the control unit.

LMV series burner controller technical parameters:

Model Maximum number of executors supported PID load control VSD control Correction for oxygen content TAS max
Gas Oil
LMV51.000B2 4 3s 5s
LMV51.100B2 4 × 3s 5s
LMV51.200A2 4*) × 3s 5s
LMV52.200A2 6 × × × 3s 5s
LMV52.240A2 6 × × × 10s 15s
Model:
--- Please Select ---

Write a review here:

  • 1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
    Loading ... Loading ...

  • seven − = 4

  • JPEG only
  • The following is the process you should take to complete your order through bank to bank transfer:

    1. Please go to your bank (through online banking, ATM or going into a branch) and complete the transfer of money. Make sure that the amount you transfer is the exact total of your order. Payment details below:

    - If your bank is located in Austria, Germany, Spain, France, United Kingdom, Italy, Netherlands, Belgium, Finland, Greece or Luxemburg you will pay to our WorldPay bank. You will see the bank details once you have placed the order.

    PLEASE NOTE: If you are paying to our WorldPay bank you MUST include the Unique Payment Reference Number (you will receive this directly after paying the order) in the description section when completing payment to help us identify your order. Failure to do this will result in an unsuccessful transaction.

    - If your bank is located in a country not listed above you will pay to our HSBC account. The details are below:

    Bank Account:
    Bank Code:
    Beneficiary:
    Bank Name:
    Bank Address:
    SWIFT Code:

    PLEASE NOTE: If you are paying in this way you MUST write your Yourname order number in the description section when paying so we can easily recognize your payment. Failure to do this will result in a delayed or failed transaction.

    2. When this is done, log in to your Yourname ‘My Account’ and complete the following:

    Click ‘Order list’
    Click ‘Pay’
    Click ‘Complete Payment’ and fill in the related information for verification (This is an important step. If the information you have filled in does not match your bank details the payment can not be completed.)
    Click ‘Submit’ to finish the procedure.

    3. You will receive a payment confirmation email from us after your order’s payment has gone through successfully. If you do not receive this email, please contact us here: http://www.Yourname.com/help/

    Please note that Yourname will begin to handle your items after payment has been cleared.

    The tailoring and handling time is the number of business days we will take to process your items before shipping them. This processing includes order verification, item manufacturing, quality checking and packaging. This does not include the shipping time.

    Different items and categories have different tailoring and handling times. However, on each item page the information is displayed next to the item photo as shown in the picture below.

    Tags: , , , , , , , , ,

    Customers Also Bought:

    INQUIRY DETAILS *

    INQUIRY NOW
    • captcha