Hi, Sign in
The output range of RS series burner is from 100 to 1395 kW. It is designed to be used in hot water or superheated water boiler, hot air generator or steam boiler and heat transfer oil furnace. The adjustment mode is “two-stage fire”. The burner is equipped with electronic device: status display screen, which can provide all burner operating parameters: operating hours, ignition times and fault information.
The fan with forward inclined blades and the installation of sound insulation materials at the air inlet of the fan ensure the reduction of noise emission.
The improvement of the performance of the combustion head of the fan increases the application scope of the burner and ensures the combustion efficiency of each operating point.
The unique design ensures the reduction of size and the simplification of use and maintenance. And provide various accessories to provide diversification of working methods.
RLS series oil gas dual purpose burner technical parameters:
Burner technical parameters | |||||||
model | RLS28 | RLS38 | RLS50 | RLS70 | RLS100 | RLS130 | |
Adjustment method | Double stage fire | ||||||
Adjust output ratio | 40210 | ||||||
servo motor | model | LKS210-08 | LKS210-10 | ||||
operation hours | 5 | ||||||
output power | KW | 100/163-325 | 116/232-442 | 145/290-581 | 232/465-814 | 349/698-1163 | 465/930-1395 |
Mcal/h | 86/140-303 | 100/200-380 | 125/249-500 | 200/400-700 | 300/600-1000 | 400/800-1200 | |
working temperature | ℃min./max | 0/40 | |||||
Calorific value of light oil | kwh/kg | 11.8 | |||||
viscosity | m㎡/s | 4÷6 | |||||
flow | Kg/h | 8/14-25 | 10/20-37 | 12/25-48 | 20/39-69 | 30/59-99 | 39/79-18 |
Maximum fuel temperature | ℃ | 60 | |||||
pump | model | AL65B | AJ6CC | ||||
Flow (kg/h12bar) | 63 | 134 | |||||
Gas fuel | G20、G25、LPG | ||||||
Fan | model | Forward inclined blade | |||||
air temperature | Maximum ℃ | 60 | |||||
Power Supply | Ph/Hz/V | 1/50/230±10% | 3N/50/230-400±10% | ||||
Control box | model | LFL1.333 | |||||
Total power consumption | KW | 0.53 | 0.76 | 0.91 | 1.8 | 2.2 | 3 |
Total rated current | A | 0.19 | 0.25 | 0.17 | 0.33 | 0.33 | 0.43 |
Protection level | IP | 44 | |||||
Motor power | KW | 0.25 | 0.12 | 0.65 | 1.1 | 1.5 | 2.2 |
Rated current of motor | A | 2.1 | 2.8 | 3-1.7 | 4.5-2.9 | 5.8-3.4 | 6.5-5.1 |
Motor starting current | A | 1.8 | 11 | 13.6-6 | 22.6-13.2 | 29.5-17 | 52.8-0.6 |
Motor protection level | IP | 44 | 55 | 54 | |||
Ignition transformer | model | 230-2*5KV | |||||
V1-V2 | 230-2*5KV | ||||||
I1-I2 | 1.8A-30mA | ||||||
Operation mode | Intermittent type requires shutdown every 24 hours |
The following is the process you should take to complete your order through bank to bank transfer:
1. Please go to your bank (through online banking, ATM or going into a branch) and complete the transfer of money. Make sure that the amount you transfer is the exact total of your order. Payment details below:
- If your bank is located in Austria, Germany, Spain, France, United Kingdom, Italy, Netherlands, Belgium, Finland, Greece or Luxemburg you will pay to our WorldPay bank. You will see the bank details once you have placed the order.
PLEASE NOTE: If you are paying to our WorldPay bank you MUST include the Unique Payment Reference Number (you will receive this directly after paying the order) in the description section when completing payment to help us identify your order. Failure to do this will result in an unsuccessful transaction.
- If your bank is located in a country not listed above you will pay to our HSBC account. The details are below:
Bank Account:
Bank Code:
Beneficiary:
Bank Name:
Bank Address:
SWIFT Code:
PLEASE NOTE: If you are paying in this way you MUST write your Yourname order number in the description section when paying so we can easily recognize your payment. Failure to do this will result in a delayed or failed transaction.
2. When this is done, log in to your Yourname ‘My Account’ and complete the following:
Click ‘Order list’
Click ‘Pay’
Click ‘Complete Payment’ and fill in the related information for verification (This is an important step. If the information you have filled in does not match your bank details the payment can not be completed.)
Click ‘Submit’ to finish the procedure.
3. You will receive a payment confirmation email from us after your order’s payment has gone through successfully. If you do not receive this email, please contact us here: http://www.Yourname.com/help/
Please note that Yourname will begin to handle your items after payment has been cleared.
The tailoring and handling time is the number of business days we will take to process your items before shipping them. This processing includes order verification, item manufacturing, quality checking and packaging. This does not include the shipping time.
Different items and categories have different tailoring and handling times. However, on each item page the information is displayed next to the item photo as shown in the picture below.