Hi, Sign in
The GULLIVER RGD series two-stage light oil burner of Riya Road is a complete product series developed according to the requirements of home heating. The GULLIVER RGD series has a total of 5 models, with outputs ranging from 14 to 296kW, divided into 4 different structures.
All models use the same parts that Riyadh designed exclusively for the GULLIVER series, with a high level of quality to guarantee safe work.
In the development of these burners, our main research is to reduce noise, facilitate installation and adjustment, and compact burners designed to meet various boiler models on the market.
The two-stage fire operation ensures the thermal efficiency of the heating equipment.
All models are certified to the European EN267 standard and comply with European targets for EMC, low voltage, mechanical and boiler efficiency.
All GULLIVER RGD burners are trial fired before leaving the factory. .
Gulliver RGD series oil burner technical parameters:
Burner technical parameters | |||||
model | RG2D | RG3D | RG4D | RG5D | |
Adjustment method | two stage fire | ||||
servo motor | model | Dedicated model | |||
operation hours | — | ||||
output power | KW | 42/49-118 | 66/83-178 | 1.6/130-237 | 96/142-296 |
Mcal/h | 36.1/42.1-101.4 | 55.9/71.4-153 | 91.2/111.8-203.8 | 81.7/122.1-254.6 | |
Kg/h | 3.3/4.1-10 | 5.5/7-15 | |||
working temperature | ℃ min/max | 0/41 | |||
calorific value | kwh/kg | 11.8 | |||
Kcal/kg | |||||
Viscosity at 20 ℃ | mm2/s | 4÷7 | |||
pump | model | RBL | |||
fLOW(kg/h12bar) | 31 | 35 | |||
Atomization pressure | Bar | 8÷16 | |||
Light oil temperature | Maximum ℃ | 41 | |||
Fuel preheating | nothing | HAVE | |||
Fan | model | Conversely sloping blades | |||
air temperature | Maximum ℃ | 41 | |||
Power Supply | Ph/Hz/V | 1/50/230±11% | |||
Control box | model | R.B.L552SE | R.B.L552SE | R.B.L552SE | R.B.L552SE |
total power consumption | KW | 0.18 | 0.39 | 0.39 | 0.47 |
total rated current | A | — | |||
Protection level | IP | 40 | |||
Motor Power | KW | 0.09 | 0.15 | 0.15 | 0.28 |
Motor rated current | A | 0.9 | 1.5 | 2 | 2.1 |
Motor starting current | A | 3.8 | 7.6 | 8 | 8.4 |
Motor protection class | IP | 21 | |||
ignition transformer | model | Built in control box | |||
Operation mode | Intermittent need to stop every 24 hours |
The following is the process you should take to complete your order through bank to bank transfer:
1. Please go to your bank (through online banking, ATM or going into a branch) and complete the transfer of money. Make sure that the amount you transfer is the exact total of your order. Payment details below:
- If your bank is located in Austria, Germany, Spain, France, United Kingdom, Italy, Netherlands, Belgium, Finland, Greece or Luxemburg you will pay to our WorldPay bank. You will see the bank details once you have placed the order.
PLEASE NOTE: If you are paying to our WorldPay bank you MUST include the Unique Payment Reference Number (you will receive this directly after paying the order) in the description section when completing payment to help us identify your order. Failure to do this will result in an unsuccessful transaction.
- If your bank is located in a country not listed above you will pay to our HSBC account. The details are below:
Bank Account:
Bank Code:
Beneficiary:
Bank Name:
Bank Address:
SWIFT Code:
PLEASE NOTE: If you are paying in this way you MUST write your Yourname order number in the description section when paying so we can easily recognize your payment. Failure to do this will result in a delayed or failed transaction.
2. When this is done, log in to your Yourname ‘My Account’ and complete the following:
Click ‘Order list’
Click ‘Pay’
Click ‘Complete Payment’ and fill in the related information for verification (This is an important step. If the information you have filled in does not match your bank details the payment can not be completed.)
Click ‘Submit’ to finish the procedure.
3. You will receive a payment confirmation email from us after your order’s payment has gone through successfully. If you do not receive this email, please contact us here: http://www.Yourname.com/help/
Please note that Yourname will begin to handle your items after payment has been cleared.
The tailoring and handling time is the number of business days we will take to process your items before shipping them. This processing includes order verification, item manufacturing, quality checking and packaging. This does not include the shipping time.
Different items and categories have different tailoring and handling times. However, on each item page the information is displayed next to the item photo as shown in the picture below.