0 Cart
  • Free Shipping over $199.99

  • 5% Off Discount Code: wowo

  • Promotion Time (01.01-12.31)

  • day ::

This product was successfully added to cart!

View Shopping Cart

High pressure regulator BN 158 Series  For liquid and steam service Compact design and easy installation.

High pressure regulator BN 158 Series For liquid and steam service Compact design and easy installation.

SKU: #001 - In Stock
USD$96.00 USD$89.00 (% off)

  • airport Shipping:  International shipping available
  •  Shipping time:   Standar(10-20 business days), Rush(5-10 business days)
  • chip Discount:  Get 2% discount on orders of USD $100.00,Get 3% discount on orders of USD $200.00
  • compass Handling time:  Ships within 3 business days after receiving cleared payment
  • available_updates Returns:  7 days money back guaratee,buyer pays return shipping

Product Detail

Customer Reviews

Shipping Guide

Delivery Time

Product Tags

High pressure regulator  BN 158 Series  For liquid and steam service Compact design and easy installation.

Application

Designed to reduce the pressure of liquefied petroleum gas and anhydrous ammonia containers, it is very suitable for large and arduous work, such as crop drying equipment, asphalt batch mixing equipment, road construction “tar car”, heat treatment and other large industrial and commercial loads. It is also an ideal choice for the first stage regulator in large multi operation
parameter

Model Caliber Max.inlet pressure outlet pressure Flow
BN1584-15 RP1/2″ l6bar(7-8bar) 0.21-2.1bar 127m3(Air)
BN1588-25 Rp1″ l6bar(7-8bar) 0.21-2.1bar 245m3(Air)

Material

Valve body: Zinc
Valve cover : Zinc
Spring : Steel
Diaphragm : Integrated fabric and synthetic rubber
Valve base : Elastic rubber
Regulating screw: Brass

Main features

1. Special diaphragm and seat materials for up to 300 ° F.
2. Large nozzles and through flow provide high capacity and freeze resistance.
3. For liquid and steam service.
4. Adjustment method: T-handle
3-3
Installation

1.Before installation, the dust and impurities in the pipeline shall be cleaned to prevent the pipeline from entering the valve chamber and causing the regulator to fail to work .
2.When installing, make sure that the gas direction and the direction marked on the valve are in the right direction.
3.After installation, adjust the T-handle screw, rotate clockwise to increase the outlet pressure; rotate counterclockwise to reduce the outlet pressure.

Maintenence

1.The regulator does not require any special maintenance. If there is a problem with the regulator, contact the manufacturer for feedback and support and perform maintenance and testing as necessary.
2.A bleed valve is recommended upstream or downstream of these regulators.

Write a review here:

  • 1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
    Loading ... Loading ...

  • 9 × three =

  • JPEG only
  • The following is the process you should take to complete your order through bank to bank transfer:

    1. Please go to your bank (through online banking, ATM or going into a branch) and complete the transfer of money. Make sure that the amount you transfer is the exact total of your order. Payment details below:

    - If your bank is located in Austria, Germany, Spain, France, United Kingdom, Italy, Netherlands, Belgium, Finland, Greece or Luxemburg you will pay to our WorldPay bank. You will see the bank details once you have placed the order.

    PLEASE NOTE: If you are paying to our WorldPay bank you MUST include the Unique Payment Reference Number (you will receive this directly after paying the order) in the description section when completing payment to help us identify your order. Failure to do this will result in an unsuccessful transaction.

    - If your bank is located in a country not listed above you will pay to our HSBC account. The details are below:

    Bank Account:
    Bank Code:
    Beneficiary:
    Bank Name:
    Bank Address:
    SWIFT Code:

    PLEASE NOTE: If you are paying in this way you MUST write your Yourname order number in the description section when paying so we can easily recognize your payment. Failure to do this will result in a delayed or failed transaction.

    2. When this is done, log in to your Yourname ‘My Account’ and complete the following:

    Click ‘Order list’
    Click ‘Pay’
    Click ‘Complete Payment’ and fill in the related information for verification (This is an important step. If the information you have filled in does not match your bank details the payment can not be completed.)
    Click ‘Submit’ to finish the procedure.

    3. You will receive a payment confirmation email from us after your order’s payment has gone through successfully. If you do not receive this email, please contact us here: http://www.Yourname.com/help/

    Please note that Yourname will begin to handle your items after payment has been cleared.

    The tailoring and handling time is the number of business days we will take to process your items before shipping them. This processing includes order verification, item manufacturing, quality checking and packaging. This does not include the shipping time.

    Different items and categories have different tailoring and handling times. However, on each item page the information is displayed next to the item photo as shown in the picture below.

    Tags: , , , , ,

    Customers Also Bought:

    Ball valve

    USD$0.00

    INQUIRY DETAILS *

    INQUIRY NOW
    • captcha