0 Cart
  • Free Shipping over $199.99

  • 5% Off Discount Code: wowo

  • Promotion Time (01.01-12.31)

  • day ::

This product was successfully added to cart!

View Shopping Cart

LAL2.14 Siemens Burner Controllers Siemens LAL series fuel burner controller

LAL2.14 Siemens Burner Controllers Siemens LAL series fuel burner controller

SKU: #001 - In Stock
USD$450.00 USD$385.00 (% off)

  • airport Shipping:  International shipping available
  •  Shipping time:   Standar(10-20 business days), Rush(5-10 business days)
  • chip Discount:  Get 2% discount on orders of USD $100.00,Get 3% discount on orders of USD $200.00
  • compass Handling time:  Ships within 3 business days after receiving cleared payment
  • available_updates Returns:  7 days money back guaratee,buyer pays return shipping

Product Detail

Customer Reviews

Shipping Guide

Delivery Time

Product Tags

LAL series fuel burner controller

Technical performance and structural characteristics:

Multi-proportional, medium and large oil burners for controlling and monitoring intermittent operation.

LAL1…no air pressure detection, yellow and blue flame oil burner. With blue flame monitor QRB1… or QRC1…

LAL2…with air pressure detection, yellow flame oil burner, semi-automatic start. Use QRB1…or RAR…

LAL3.25…for special equipment such as incinerator systems. External light will not cause the burner to lock up, but it will prevent the burner from starting

LAL4…Yellow and blue flame oil burner with air pressure detection. With blue flame monitor QRB1… or QRC1…

Control and monitor fuel injection burners.

Medium or large burners.

Run intermittently (must stop every 24 hours).

For use with continuous or proportional burners.

Suitable for stationary air preheaters.

Installation Precautions:

The controller unit and other cables must be installed separately from the high voltage ignition cables.

Don’t confuse phase and neutral.

Install switches, fuses, grounding, etc. in accordance with local regulations.

It must be confirmed that the maximum current allowed by the terminals is not exceeded.

Do not connect mains power to the burner controller’s output terminals.

Use an omnipolar switch to isolate the burner control from the mains with a minimum 3mm contact gap.

Secure the ground bushing under the chassis with metric screws and loose washers.

In the absence of a fan, an AGK25 must be connected to terminal 3 of the controller, otherwise the burner will not start reliably.

For safety, connect the neutral wire to terminal 2 on the bottom of the neutral distributor or plug-in block. The combustion components (fan, ignition transformer, and gas valve) are listed in Figure 7435a14 and must be connected to the neutral conductor as shown below.

The connection between neutral and terminal 2 is pre-wired on the bottom of the control unit.

Debug instructions:

Please make sure the wiring is connected correctly before debugging. When commissioning equipment or maintenance work, please carry out the following safety checks: 1. Expected reactions.

2. Lock at the end. Lock for 40 seconds.

3. Lock. Locked after TSA.

LAL series fuel burner controller technical parameters:

Model LAL2.14 LAL1.25 LAL2.65
LAL4.25A27
LAL2.25
LAL3.25
t1 Pre-purge time damper fully open 10s 22.5s 67.5s
TAS safe ignition time 4s 5s 5s
t3 Short pre-ignition time 2s 2.5s 2.5s
t3′ Long pre-ignition time from start (monitor air pressure since receiving pressure signal)
Ignition time after t3n 10s 15s 15s
t4 Time interval between BV1-BV2 or BV1-LR 8s 7.5s 7.5s
The time interval from the end of t5t4 to the pressure relief of No. 20 terminal 4s 7.5s 7.5s
Purge time after t6 15s 15s
t7 Time interval from start command to release of voltage at terminal 7 2s 2.5s 2.5s
t8 start time (excluding t11 and t12) 30s 47.5s 92.5s
t10 6s 10s 10s
t11 Full throttle time Elective
t12 Throttle valve closed to ignition position time
t13 Allow purge time after shutdown 10s 15s 15s
t16 Start command to full throttle command interval 4s 5s 5s
t20 Purge after shutdown until next start interval 32s 35 seconds 12.5s
Comment Ignition spark monitoring General equipment medium viscosity or heavy oil burners
Model:
--- Please Select ---

Write a review here:

  • 1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
    Loading ... Loading ...

  • 5 × = twenty

  • JPEG only
  • The following is the process you should take to complete your order through bank to bank transfer:

    1. Please go to your bank (through online banking, ATM or going into a branch) and complete the transfer of money. Make sure that the amount you transfer is the exact total of your order. Payment details below:

    - If your bank is located in Austria, Germany, Spain, France, United Kingdom, Italy, Netherlands, Belgium, Finland, Greece or Luxemburg you will pay to our WorldPay bank. You will see the bank details once you have placed the order.

    PLEASE NOTE: If you are paying to our WorldPay bank you MUST include the Unique Payment Reference Number (you will receive this directly after paying the order) in the description section when completing payment to help us identify your order. Failure to do this will result in an unsuccessful transaction.

    - If your bank is located in a country not listed above you will pay to our HSBC account. The details are below:

    Bank Account:
    Bank Code:
    Beneficiary:
    Bank Name:
    Bank Address:
    SWIFT Code:

    PLEASE NOTE: If you are paying in this way you MUST write your Yourname order number in the description section when paying so we can easily recognize your payment. Failure to do this will result in a delayed or failed transaction.

    2. When this is done, log in to your Yourname ‘My Account’ and complete the following:

    Click ‘Order list’
    Click ‘Pay’
    Click ‘Complete Payment’ and fill in the related information for verification (This is an important step. If the information you have filled in does not match your bank details the payment can not be completed.)
    Click ‘Submit’ to finish the procedure.

    3. You will receive a payment confirmation email from us after your order’s payment has gone through successfully. If you do not receive this email, please contact us here: http://www.Yourname.com/help/

    Please note that Yourname will begin to handle your items after payment has been cleared.

    The tailoring and handling time is the number of business days we will take to process your items before shipping them. This processing includes order verification, item manufacturing, quality checking and packaging. This does not include the shipping time.

    Different items and categories have different tailoring and handling times. However, on each item page the information is displayed next to the item photo as shown in the picture below.

    Tags: , , , , , , , , ,

    Customers Also Bought:

    INQUIRY DETAILS *

    INQUIRY NOW
    • captcha